
1965 · 27 min
The electrification of the London Midland Region main line between London, Manchester and Liverpool at 25KV AC, using overhead wires and drawing supply from the National Grid, was a major undertaking involving civil, electrical, mechanical and signal engineering of a complex and advanced nature. This film depicts some aspects of the problems involved and of the unprecedented operations which were carried out.
Crew
Crew
External reads
No articles linked yet.
🔥 Hot takes
warming up the wall…
Metadata & streaming data: TMDB (JustWatch). This product uses the TMDB API but is not endorsed or certified by TMDB.